Risk To Okefenokee: Comment Period Extended For Twin Pines Draft Permits

The comment period has been extended. There is a link for comments below, along with a form to sign up for a virtual meeting on March 5th. Below is an update from the Georgia Conservancy, which includes background information on environmental concerns.

https://mailchi.mp/gaconservancy/draft-mining-permit-issued-update?e=868724ca64

The draft permits, along with more documents can be found on the link to the EPD website. The link for submitting comments is on the first document on the link below, “Twin Pines Draft Permit Update.”

https://epd.georgia.gov/twin-pines?mc_cid=cc4f8550f0&mc_eid=868724ca64

I’ve excerpted the email address for comments below, but you will have to cut and paste the address into your email browser, as this is not an active link:

TwinPines.Comment@dnr.ga.gov

This entry was posted in Clyde's Columns and tagged . Bookmark the permalink.